Table 7 – 1994 Tall Fescue Trial – Tomslake

1994 Tall Fescue Trial

Bob and Joan Tubb, Tomslake, BC

Dry Matter Yield (kg/ha)
Cultivar or Strain 1995 Total 1996 2-Jul 1997 3-Jul 1998 3-Jul 1999 29-Jul 2000 2 cuts 6 Year Mean % of Courtenay
141-0022 2103 2984 3408 3601 4267 2509 3145 107
141-0021 2315 3070 3269 3359 3750 2049 2969 101
Courtenay* 2281 2820 3412 3209 3477 2433 2939 100
Stef* 2193 2645 2949 2928 3958 2164 2806 95

 

Source:
Jim Forbes, BC Ministry of Agriculture, Food & Fisheries
Tel: (250) 784-2225 Fax: (250) 784-2299
E-mail: Jim.Forbes@gems7.gov.bc.ca

Site Information: The site is located 20 miles South East of Dawson Creek on Hazelmere-Snipe soil with a CLI rating of 4X
Design: Randomized complete block with four reps.
Plot Size and Harvest Area: 1.2m by 6m and 0.6m by 4.5m respectively. Varieties were planted in 30.5cm rows
Fertilizer: 150 lbs/acre 13-16-10 each fall plus 100 lbs/acre 34-0-0 each spring.
Harvesting: First cut at early heading stage in late June and a second cut in late August if sufficient regrowth.